9,000 cubic yards of concrete
The JEA Nassau project located in Yulee, Florida is a 3 MGD expansion to the existing Water Reclamation Facility. Construction included the following structures; Oxidation Ditch with associated splitter box and electrical building, Headworks, UV Disinfection, Disk filter, Sludge Tank, and additional miscellaneous buildings and structures.